Annual Energy Audit Report of FY 2022-23 Samanvay Samiti Ganeshotsav 2023 Booklet FAQ on SMART PREPAID Meter Tariff Schedule For FY 2023-24 to FY 2024-25. Press Note for Tariff Schedule. Ministry of New and Renewable Energy (MNRE), Government of India, introduced Phase II Rooftop Solar scheme and New simplified procedure for providing Financial Assistance for installation of Rooftop Solar panel for residential consumers. Guidance Note (English and Marathi) & (Video) on e-hearing of MTR Tariff Petition BEST MTR Petition in Case No. 212 of 2022: Public Notice English / Marathi NIT for purchase of power on short term basis for the month from April, 2023 to March, 2024 Policy for licensing of spaces for installation of telecom equipment Policy for licensing of spaces for installation of telecom equipment BEST Varta 75 Years   Ministry of new and renewable energy issues advisory for the general public on rooftop solar scheme    MERC Practice Direction relating to revision in Contract Demand in a billing cycle.   Press Note - Retail Electricity Tariff Schedule English  Marathi 

Revision in Service Connection Charges

MERC vide its order dated 16.02.2018 in case No.86 of 2017 in the matter of BEST's petition for revision in Service Connection Charges, has revised the charges as tabulated below:
 

Sr.No.

Particulars

Charges approved by Commission in this Order (Rs.)

L.T. Supply

1

Single Phase

a)

For loads upto 5 KW

2000

b)

Loads above 5kw and upto 10 KW

2000

2

Three Phase

a)

Motive power upto 27 HP or other loads upto 20 KW

3000

b)

Motive power above 27 HP but upto 67 HP or other loads above 20 KW but upto 50 KW.

6500

c)

Motive power above 67 HP but upto 134 HP or other loads above 50 KW but upto 100 KW.

12000

d)

Motive power above 134 HP but upto 201 HP or other loads above 100 KW but upto 150 KW.

12000